Delivery & Packaging
Packaging planned around the way you intend to build.
We can develop and agree a project-specific packaging arrangement that helps your team receive, identify and distribute the aluminium elements in a practical sequence. Discuss grouping by floor, installation stage or project zone before the delivery plan is finalised.
Project-specific planning
We can develop and agree packaging for your project
The most useful packaging arrangement depends on the element sizes, supply condition, transport route and site workflow. An order intended for direct installation may need a different grouping from one received into a warehouse or distributed across several buildings.
Send us your installation sequence and receiving requirements. We can review how the supplied elements, glazing and separate components should be protected, grouped and identified, then agree a practical packing and delivery scope with your team.
Three ways to organise supply
Group the delivery around your installation plan
Division by floor
Identify the elements for each level using the project’s floor references. Where practical and agreed, packs can be organised so the receiving team can recognise the floor destination without sorting the whole order on arrival.
Confirm the route from the unloading point to each level and the available handling or storage arrangements. A floor label does not replace that access review.
Division by installation stage
Group the elements needed for a defined construction or installation phase. Agree which assemblies and associated components belong to each stage, together with the intended delivery sequence.
Keep phase definitions clear. If a stage changes, identify the affected element references and review the revised grouping before packaging or dispatch.
Division by building or zone
Separate requirements for individual buildings, elevations, wings or work zones. This can help distinguish otherwise similar elements within a larger development or a distributor’s project order.
Use consistent names across drawings, element schedules, labels and the receiving list. Combine zone and floor references where the site requires both.
A clear grouping schedule makes the plan usable
Use a simple schedule linking the installation sequence to the element references. The final pack arrangement is reviewed against dimensions, weight, protection and the agreed handling method; one installation group does not necessarily fit into one transport pack.
| Installation stage | Floor / zone | Element references | Example pack reference |
|---|---|---|---|
| Stage 1 | Ground floor · Entrance | D01–D03 | G-01 |
| Stage 2 | Floors 1–2 · East wing | W11–W18 | E-01 / E-02 |
| Stage 3 | Floor 3 · Terrace | S01–S02 | T-01 |
Illustrative references only. Actual pack quantities, dimensions and grouping are agreed for the manufactured elements and the project logistics.
Grouping and delivery dates are separate decisions
A complete order can be grouped internally by floor or stage and delivered together. Alternatively, separate deliveries can be discussed for agreed phases. Confirm which approach you need, including any storage, transport and programme implications.
Identification & traceability
Labels that connect the pack to the drawings
Agree a labelling structure your receiving and installation teams can use. The same element references should remain recognisable in the approved schedule, pack information and delivery list.
- Project and order reference.
- Building, floor, zone and installation stage, where applicable.
- Pack identifier and the elements associated with it.
- Identification of separate glazing, hardware or accessories.
- Agreed dimensions, weight and handling information where required.
- Delivery contact and receiving location information as agreed.
Keep related parts identifiable
If the agreed supply includes loose components, separate glazing or items completed on site, link them to the relevant element and stage. Confirm whether they travel in the same pack or in a separately identified package.
Project / Stage 2 / Floor 3 / Zone A / Pack 03
A shared reference helps the team understand where a pack belongs. It should be accompanied by the agreed contents information rather than used as the only record of the delivery.
Protection & access
Select packaging for the actual elements and route
Review the complete supply condition: glazed assemblies, unglazed frames, separate glass and accessories can require different protection and support. Racks, crates, pallets or other arrangements can be evaluated as appropriate to the package and receiving method.
Protect the supplied surfaces
Coordinate supports and protection with the frames, glass, finishes and projecting components. Confirm approved materials and the removal sequence so protection remains useful during transport and receipt.
Check the receiving route
Provide vehicle access, unloading-space and route restrictions. Include doors, lifts, storage areas and onward movement to installation zones. Pack dimensions must be reviewed against the actual route.
Agree handling responsibility
Identify who provides unloading equipment and who manages movement on site. Handling and lifting arrangements need a competent review for the actual packs and elements; grouping labels are not handling instructions.
Receive the delivery with a defined checklist
- Confirm the receiving arrangement. Keep the agreed contact, access and unloading provision available at the delivery point.
- Match the pack references. Compare received packs and associated components with the agreed delivery list and stage allocation.
- Record the condition. Note visible packaging damage or discrepancies promptly and follow the agreed reporting procedure.
- Preserve identification. Keep element and pack references traceable while goods are moved into storage or distributed to floors and zones.
- Store and unpack as agreed. Follow the relevant instructions for the supplied assemblies, glazing and protection materials.
For further project preparation, see delivery, storage and handling and the handover inspection guide.
What to send
Prepare a packaging and delivery brief
Your installation plan
- Project, building and destination references.
- Element schedule with clear identifiers.
- Floor, zone and phase allocation.
- Installation sequence and requested delivery stages.
- Supply condition and separately delivered components.
- Required pack labels and contents-list format.
Your receiving conditions
- Delivery point and responsible contact.
- Vehicle access and unloading restrictions.
- Available handling equipment and responsibilities.
- Route dimensions and onward movement requirements.
- Storage location and expected storage period.
- Any special protection, packaging or documentation needs.
If a route, phase or handling method remains undecided, identify it in the brief. The packaging arrangement should be agreed against confirmed constraints before the delivery is prepared.
Questions about project packaging
Can you develop packaging around our project?
Yes. We can develop and agree a packaging arrangement based on your element schedule, installation sequence and receiving requirements. Confirm the proposed grouping, protection, labels and handling interfaces as part of the actual supply scope.
Can the order be divided by floor or installation stage?
Yes, division by floor, stage, building or zone can be discussed and agreed. The actual pack arrangement depends on the elements, transport and handling conditions. One floor or stage may require several identified packs.
Does grouping by stage mean separate deliveries?
Not automatically. Packs can be grouped by stage within one delivery, or separate phased deliveries can be considered. Agree the shipment sequence, receiving arrangements and associated commercial and programme conditions explicitly.
When should special packaging be discussed?
Raise it during the quotation and technical coordination stages. Early information lets the packing arrangement be assessed alongside element dimensions, production, transport and site access. Late changes require a review before they are accepted.
Can floor or phase allocations change after the plan is approved?
Request a review and identify the affected elements and pack references. The feasibility and consequences depend on production, packaging and dispatch status. Keep the authorised revision consistent with the delivery list and receiving team’s information.
Plan your delivery
Tell us how you want to realise your project
Send the element schedule, floor or stage allocation and receiving constraints. We can review and agree packaging that supports the way your team intends to organise the work.