Alumproof · Project & trade supply
For Contractors & Distributors
Aluminium windows, doors and facades with a clear route from enquiry to approved drawings, fabrication and delivery.
Bring us your project schedule or trade supply requirements. We help connect system selection and production details with the scope you need to quote, procure and deliver.
Two routes to cooperation
Built around your role in the project
For contractors
Coordinate an aluminium package with the building programme, structural openings and other trades. Send us drawings, schedules and performance requirements so the offered systems, glazing, hardware and installation interfaces can be reviewed together.
Agree what is included in the supply, what the site team provides and which decisions must be approved before manufacture.
For distributors
Discuss project-based supply, recurring requirements or a defined product range for your market. Identify your customer profile, expected order pattern and the technical support you need to prepare consistent quotations.
Agree product identification, order information, documentation and responsibility for local measurement, installation and customer support as part of the proposed arrangement.
Technical supply capability
From system selection to a coordinated supply package
Alumproof works with aluminium window, door, sliding, folding and facade system platforms, including Schüco, Reynaers Aluminium and Aluron. The proposed configuration is reviewed against the project requirements and the documentation for the selected system.
Windows & entrance doors
Review fixed and opening arrangements, glazing, finishes, locks, hinges and threshold details. Coordinate performance requirements with the actual element size and the proposed assembly.
Sliding & folding doors
Compare opening layouts, clear passage, panel parking, operating weight and threshold interfaces. Resolve access and service requirements before the surrounding construction is fixed.
Facades & custom glazing
Coordinate elevations, profiles, glass build-ups, opening inserts and connection zones. Review structural inputs, weather interfaces and installation access with the responsible project teams.
Production preparation
Connect approved dimensions and details with profile processing, assembly, glazing and component selection. Keep revisions and authorised substitutions identifiable before material orders and fabrication are released.
Finishes & accessories
Define colour, gloss, texture, internal and external faces, and the finish of hardware and adjacent parts. Use agreed samples to establish the intended appearance.
Packaging & delivery
Agree element identification, protection, delivery sequence and destination requirements. Coordinate unloading, site access and storage responsibilities with the receiving team.
Explore the aluminium systems catalogue · View project applications
Quotation clarity
Know what the offer includes before comparing prices
A useful quotation makes technical assumptions and supply boundaries visible. Agree the following items so alternatives can be compared on the same basis and site responsibilities remain clear.
| Scope item | Information to confirm |
|---|---|
| System & configuration | System variant, element dimensions, opening directions, glazing build-up and required performance evidence. |
| Finish & hardware | Colour reference, surface appearance, sample approval, handles, locks, hinges and operating accessories. |
| Supply condition | Assembly and glazing condition, included components, loose parts and any agreed site-completed work. |
| Design & installation interfaces | Drawings, fixing and support inputs, measurement responsibility, perimeter connections and installation scope. |
| Logistics | Packaging, labelling, delivery point, shipment sequence, unloading equipment and storage conditions. |
| Commercial & service terms | Quotation validity, payment terms, agreed timing, changes, warranty scope and after-sales responsibilities. |
Commercial terms and timing are confirmed for the actual order. For a practical comparison checklist, see comparing aluminium window and door quotations.
A controlled order process
Your order at a glance
See How We Work: the full seven-stage project process for the route from drawings and technical review through indicative pricing, engineering, approval, production and delivery. The overview below highlights the practical order-coordination tasks.
Brief the requirement
Send the project location, drawings or element schedule, intended systems and current programme. For a distribution enquiry, describe your market, customer needs and expected order pattern.
Review the proposal
Clarify missing information, system suitability, glazing, hardware and supply boundaries. Record alternatives and exclusions so the quotation can be evaluated against a defined brief.
Coordinate the details
Resolve dimensions, opening arrangements, finishes, supports and connections. Assign responsibility for final measurement and for the building interfaces outside the agreed supply package.
Approve for manufacture
Confirm the drawing revision, configuration and authorised changes. Agree the release conditions before material ordering or fabrication; later changes need a recorded review of their consequences.
Prepare the supply
Connect production with the approved information. Agree inspection records, element labels, protection and any separate components or documentation required with the delivery.
Receive & hand over
Check the delivery against the agreed list and record any damage or discrepancies. Keep component identities, operating information and the approved service route available to the receiving team.
Repeat orders & distribution
Make the next order easier to define
For recurring supply, agree a consistent information set instead of rebuilding the specification from incomplete notes. A shared product schedule can help separate standard selections from project-specific changes.
- Use clear element references, dimensions and handing.
- Record approved systems, glass, hardware and finishes.
- Identify which options need a separate technical review.
- State the required language and format of documentation.
- Agree order confirmation, change control and delivery contacts.
- Define who handles local measurement, installation and end-customer service.
Discuss quantities, destination markets, packaging and order frequency with us. Any volume terms, minimum quantities or distribution conditions form part of the agreed offer.
Project documentation
Keep the evidence tied to the supplied assembly
Agree the documents needed for the destination market and project before procurement. Depending on the selected products and scope, these may include drawings, glazing schedules, relevant declarations and performance information, component lists, and operation and maintenance instructions.
A system brochure describes a range. The project pack should identify the actual configuration and any approved alternatives. Applicable calculations or assessments remain with the responsible qualified designers.
Quotation document checklist
Shop-drawing approval checklist
Handover inspection guide
Prepare your enquiry
What to send for a useful first review
For a contractor project
- Project location, building use and enquiry contact.
- Plans, elevations and a window, door or facade schedule.
- Dimensions, quantities and opening arrangements.
- Performance requirements, glass and finish preferences.
- Supply and installation responsibilities.
- Programme, delivery stages and site access constraints.
For a distributor enquiry
- Company details and intended destination market.
- Product families and typical customer projects.
- Example element schedules or a representative enquiry.
- Expected order pattern and any indicative quantities.
- Documentation, packaging and delivery requirements.
- Local installation and customer-support arrangements.
If the information is preliminary, identify what remains open. Send the available documents through our contact page so we can clarify the next steps.
Questions before we start
Can we discuss a single project as well as recurring supply?
Yes. State whether your enquiry concerns one defined project, a series of orders or a distribution arrangement. The technical review and proposed commercial scope can then be based on that requirement.
Is installation included in every quotation?
Installation scope must be agreed explicitly. Confirm who measures, prepares openings, provides supports, installs the elements and completes perimeter sealing. The quotation should identify included work and responsibilities assigned to the project or local installation team.
Can a preferred system or configuration be proposed?
Send the preferred system and the project requirements. We can review the proposed configuration, available documentation and fabrication considerations. Any alternative should be assessed against the same brief and approved before it replaces the original selection.
What is needed to confirm price and delivery timing?
A sufficiently defined element schedule, approved technical scope and delivery requirements are needed. Material availability, finishes, glazing, quantities and remaining approvals can affect the offer. Price, timing and any volume conditions are confirmed in the quotation and order process.
How are changes after approval handled?
Identify the affected elements and drawing revision, then request a review before the change is implemented. The review should address technical compatibility, materials already ordered, production status, cost and programme. Retain the authorised decision with the order information.
Start the conversation
Bring us the aluminium package you need to deliver
Send your drawings, schedule or trade supply brief. Include your company, project or market location, required products and planned timing. We can review the information and clarify a workable quotation scope.
Support for architects and design teams · Explore 100 technical guides