How We Work: Project Process

Drawings → Technical review → Indicative price → Engineering → Approval → Production → Delivery.

A clear sequence helps you understand what to send, what each stage produces and which decisions must be confirmed before your aluminium windows, doors or facade enter production.

The seven stages

A defined route from brief to delivery

The level of detail develops as the project progresses. An indicative budget can be based on recorded assumptions; manufacture requires a confirmed technical and commercial basis. The agreed engineering scope and any associated commercial conditions are clarified before that work begins.

  1. Stage 1Drawings
  2. Stage 2Technical review
  3. Stage 3Indicative price
  4. Stage 4Engineering
  5. Stage 5Approval
  6. Stage 6Production
  7. Stage 7Delivery
1

Drawings

Start with a defined opening or aluminium package, not only a product photograph.

From you

Send plans, elevations or dimensioned sketches, an element schedule and the project location. Identify quantities, opening directions and any known glass, finish or performance requirements.

What we do

We establish what you are asking us to supply and which information is available. Preliminary information is useful when its assumptions and unresolved items are clearly marked.

Outcome

A project brief that can be reviewed, with missing information identified before a price is treated as meaningful.

2

Technical review

Check whether the proposed configuration and the building interfaces form a workable brief.

From you

Identify the intended use, exposure, performance requirements, supply scope and planned timing. Tell us about access restrictions, unusual dimensions and any preferred system.

What we do

We review system suitability, dimensions, glazing, hardware, opening movement, fabrication considerations and the interfaces needing coordination. Questions or alternatives are returned for clarification.

Outcome

A technically clearer scope and a list of decisions or project inputs needed for the next stage.

3

Indicative price

Establish a budget basis while keeping preliminary assumptions visible.

From you

Confirm the scope and the options to be priced. Identify your budget objective, quantities and delivery destination, and clarify whether installation or other site work is part of the request.

What we do

We prepare an indicative price where the information is sufficient. It is based on stated assumptions, quantities, configurations and supply boundaries; unresolved items remain visible.

Outcome

An initial commercial basis for deciding whether to develop the proposal. It is not a manufacturing release or a guarantee of the final order price.

Budget estimate and final order price are different stages. Changes to dimensions, glass, finishes, hardware, quantities, delivery or the supply scope can change the price. The final proposal must match the agreed configuration and applicable commercial terms.
4

Engineering

Develop the agreed aluminium package into coordinated technical information.

From you

Provide the required design inputs, final measurement responsibility and decisions on systems, glazing, finishes and hardware. Coordinate structural and adjoining-building information with the responsible project team.

What we do

Within the agreed scope, we develop production-oriented drawings, system sections and relevant interfaces. Component choices and configuration evidence are reviewed against the actual assembly.

Outcome

A coordinated package for review, including drawing revisions, unresolved matters and any required assessment by the responsible project designers.

5

Approval

Make the manufacturing basis explicit and confirm it in writing.

From you

Review the issued drawings and schedules. Confirm final dimensions, quantities, opening directions, glazing, finishes and hardware, together with the agreed supply and delivery conditions.

What we do

We resolve comments and identify the final approved revision. Changes to the technical scope are checked against the commercial proposal and order requirements before release.

Outcome

A documented approval and an agreed order basis. Manufacturing starts after the required approvals and agreed release conditions have been satisfied.

Check before approval:

  • Final dimensions and the party responsible for measurement.
  • Element references, quantities and opening directions.
  • Selected systems, glazing, finishes and hardware.
  • Supports, fixing inputs and adjoining-building interfaces.
  • Included supply, site responsibilities and documentation.
  • The approved drawing revision and agreed release conditions.
6

Production

Fabricate the elements against the approved information.

From you

Keep the agreed approval basis stable and communicate any requested change promptly. Confirm remaining delivery coordination through the designated project contact.

What we do

The approved configuration is transferred into material procurement, profile processing, assembly, glazing and checks as applicable to the order. Elements and separate components are identified for the agreed supply.

Outcome

The manufactured package, prepared for the agreed inspection, protection, packaging and delivery requirements.

7

Delivery

Transfer the package with a defined receiving and handover arrangement.

From you

Confirm the delivery contact, access, unloading arrangements and suitable storage. Check the received goods against the agreed list and record any damage or discrepancies promptly.

What we do

We coordinate the agreed delivery scope, element identification and accompanying information. Documentation and service responsibilities follow the order and selected products.

Outcome

An identified supply package and a clear record for receipt, installation coordination and subsequent operation or maintenance.

Packaging can be planned around your installation sequence. We can develop and agree grouping by floor, stage, building or zone, together with pack identification and receiving requirements. See Delivery & Packaging for the information needed to prepare the plan.

Before you enquire

Is your project ready for a useful review?

You have drawings and a defined requirement

Send the available plans, elevations and schedule with the project location. Add your required systems, glazing or performance criteria, preferred finishes, supply scope and planned timing. Identify what is final and what remains open.

Use the quotation document checklist

Your project is still at concept stage

Send a dimensioned sketch and explain the intended use and priorities. We can review the information available and clarify what is needed next. A photograph, floor area or opening count alone does not define an order-ready aluminium package.

See what affects aluminium project cost

Tell us what you need us to supply

Distinguish fabrication, glazing, delivery, installation and other site work. Measurement, building supports, perimeter interfaces, unloading and local installation responsibilities should be agreed explicitly. This keeps the quotation comparable and avoids assumptions between trades.

Questions about the process

Do we need completed engineering drawings to make the first enquiry?

No. Dimensioned preliminary drawings or sketches can provide a starting point when unresolved items are identified. The technical review determines what further information is needed. Final dimensions and the approved configuration are required before manufacturing release.

Why can an indicative price change after engineering?

Engineering may resolve details that were assumptions in the initial brief. Glass build-ups, hardware, structural inputs, finishes, dimensions and supply boundaries can affect the proposal. Changes should be identified and reflected in the agreed order basis before manufacture.

Is every technical service included in the initial quotation?

The scope is agreed for the enquiry. Clarify the required drawing development, calculations, coordination, revisions and other services before work begins. Any additional engineering scope and associated commercial conditions should be confirmed explicitly.

Who confirms dimensions and installation details?

The responsible parties are agreed for the project. Final measurement, structural inputs and adjoining-building details need clear ownership. Our package should identify its interfaces and the information required from the contractor, installer or responsible project designer.

Can we change an element after approval?

Request a review before the change is implemented. Identify the affected element and drawing revision. Material orders, fabrication status, technical compatibility, cost and timing must be considered; a requested change is not approved merely because it has been sent.

When is delivery timing confirmed?

Timing is agreed against the actual scope, material requirements, approval status and delivery arrangement. An early target programme should be distinguished from confirmed order terms. Notify us of site or programme changes so the delivery plan can be reviewed.

Guidance for your project team

Architects & designers

Coordinate system selection, design intent and the technical inputs needed for the aluminium package.

For Architects

Contractors & distributors

Define quotation boundaries, order information, logistics and local installation or customer-support responsibilities.

For Contractors & Distributors

Technical preparation

Use practical guides to review glazing, profiles, drawings, installation interfaces and handover information.

Explore 100 technical guides

Shop-drawing approval checklist · Delivery, storage and handling · Handover inspection

Start at the right stage

Send the drawings and tell us what is already decided

Include your project location, element schedule or dimensions, quantities, required performance, supply scope and planned timing. If some information is preliminary, identify the assumptions so we can review the next step.

Published by Alumproof. The agreed project scope, technical configuration and order conditions govern the work, approval and delivery requirements for each enquiry.