Technical guide

Certified Window Components and Building Assessment

A certificate can support product selection only when its scope matches the proposed component and intended use. It does not automatically certify the building containing that component. Record exactly which document is being relied upon and ask the project assessor what additional calculation or installation evidence is required.

Alumproof · Technical resources · 3 min read

Concept illustration: Certified Window Components and Building Assessment
AI-generated conceptual illustration. Refer to the selected system documentation for construction details.
On this page
  1. Read the identification and scope
  2. Connect component data to the project model
  3. Control substitutions during procurement
  4. Information to agree before manufacture
  5. A question to resolve early
  6. Manufacturer reference
  7. Related technical guides
  8. Discuss your project with Alumproof
Project focus: Check the scope of window certificates and distinguish component documentation from a whole-building assessment.

Read the identification and scope

Check the product name, variant, document date and referenced configuration. Review included glass, opening types, dimensions and any installation assumptions. A certificate for a particular component should not be presented as evidence for an unlisted alternative. Keep the complete document available rather than relying on a brochure badge or an isolated value.

Connect component data to the project model

The building assessment needs the relevant geometry, orientation and connected construction. Confirm which product values the assessor requires and how they should be reported. A system family may include several thermal variants; use the one actually specified. Record changes to glazing, frame proportions or installation details so the model can be updated.

Control substitutions during procurement

If a supplier proposes a different component, ask for a comparison against the original assessment requirements before approving it. Similar appearance is not enough to establish equivalent evidence. Track the decision in the window schedule and drawings. At handover, retain the documents for the manufactured configuration, including any approved departures from the initial specification.

Information to agree before manufacture

  • Identify the exact certificate and its issuing body.
  • Check the listed product variant and configuration limits.
  • Confirm the values required by the building assessor.
  • Coordinate installation assumptions with project sections.
  • Review substitutions before procurement or manufacture.
  • Retain final product evidence with the assessment records.

A question to resolve early

Does a component certificate mean the building is certified?

No. A building assessment considers the complete project and its applicable process. A component document is one input whose scope and relevance must be checked by the responsible assessor.

Manufacturer reference

Schüco describes certified passive-house configurations within the AWS 90.SI+ offering; this does not extend automatically to every assembly or building. Schüco: AWS 90.SI+.

This reference illustrates a manufacturer’s system approach. Confirm availability, applicable documentation and the final configuration with the project supplier.

Related technical guides

Discuss your project with Alumproof

Send your drawings, project location and required performance. We can review the information and clarify the system configuration and quotation scope.

Send a project enquiry

All technical guides · Technical support for architects · Explore aluminium systems

Published by Alumproof. Technical information checked on 6 October 2026. Confirm the final specification against the documentation for the selected system and project configuration.