Read the identification and scope
Check the product name, variant, document date and referenced configuration. Review included glass, opening types, dimensions and any installation assumptions. A certificate for a particular component should not be presented as evidence for an unlisted alternative. Keep the complete document available rather than relying on a brochure badge or an isolated value.
Connect component data to the project model
The building assessment needs the relevant geometry, orientation and connected construction. Confirm which product values the assessor requires and how they should be reported. A system family may include several thermal variants; use the one actually specified. Record changes to glazing, frame proportions or installation details so the model can be updated.
Control substitutions during procurement
If a supplier proposes a different component, ask for a comparison against the original assessment requirements before approving it. Similar appearance is not enough to establish equivalent evidence. Track the decision in the window schedule and drawings. At handover, retain the documents for the manufactured configuration, including any approved departures from the initial specification.
Information to agree before manufacture
- Identify the exact certificate and its issuing body.
- Check the listed product variant and configuration limits.
- Confirm the values required by the building assessor.
- Coordinate installation assumptions with project sections.
- Review substitutions before procurement or manufacture.
- Retain final product evidence with the assessment records.
A question to resolve early
Does a component certificate mean the building is certified?
No. A building assessment considers the complete project and its applicable process. A component document is one input whose scope and relevance must be checked by the responsible assessor.
Manufacturer reference
Schüco describes certified passive-house configurations within the AWS 90.SI+ offering; this does not extend automatically to every assembly or building. Schüco: AWS 90.SI+.
This reference illustrates a manufacturer’s system approach. Confirm availability, applicable documentation and the final configuration with the project supplier.
Related technical guides
Discuss your project with Alumproof
Send your drawings, project location and required performance. We can review the information and clarify the system configuration and quotation scope.
All technical guides · Technical support for architects · Explore aluminium systems