On this page
Describe use in practical terms
Record opening frequency, peak periods, delivery traffic and the likelihood of misuse. Identify whether users carry equipment or need assistance. Discuss the conditions with the supplier so hardware selection follows the intended duty. Avoid converting a laboratory cycle figure directly into guaranteed years of service without considering the test conditions and actual use.
Coordinate the full hardware set
Review hinges, locks, handles, closers and access controls together. A high-duty component does not independently establish the durability of every door assembly. Confirm leaf dimensions, weight and compatibility of the selected hardware. Agree the daily operating sequence, especially when the door is locked, held open or controlled from a reception area.
Make maintenance part of procurement
Ask which components require inspection and what symptoms users should report. Plan access to fixings and service parts after interior and exterior finishes are installed. Retain product identification and configuration information. Include a realistic servicing arrangement in the procurement scope so the operational brief remains supported beyond the initial handover.
Information to agree before manufacture
- Record estimated use, peak periods and user needs.
- Confirm leaf weight and supported hardware combination.
- Review relevant test evidence and its stated conditions.
- Coordinate locking, closing and access-control operation.
- Agree inspection, adjustment and service access.
- Keep component identities and maintenance information at handover.
A question to resolve early
Does a tested cycle count guarantee a fixed service life?
No. It describes a test under stated conditions. Actual service depends on the assembly, installation, environment, use and maintenance, so ask for applicable evidence and an operational maintenance plan.
Manufacturer reference
Schüco presents AD UP 75 as a door platform for residential and commercial applications with configurable hardware. Schüco: AD UP 75.
This reference illustrates a manufacturer’s system approach. Confirm availability, applicable documentation and the final configuration with the project supplier.
Related technical guides
Discuss your project with Alumproof
Send your drawings, project location and required performance. We can review the information and clarify the system configuration and quotation scope.
All technical guides · Technical support for architects · Explore aluminium systems