Shop Drawing Review Before Aluminium Fabrication

Quotation drawings define a scope; production drawings must resolve the details needed to manufacture and install it. A formal review helps prevent errors becoming finished components. Approval should identify the exact drawing revision and the matters that remain to be resolved.

Alumproof · Technical resources · 2 min read

Concept illustration: Shop Drawing Review Before Aluminium Fabrication
AI-generated conceptual illustration. Refer to the selected system documentation for construction details.
On this page
  1. Check geometry and opening directions
  2. Confirm the actual specification
  3. Review installation sections
  4. Use controlled revisions
  5. Approval checklist
  6. Further technical information
  7. Discuss your project with Alumproof

Check geometry and opening directions

Review overall dimensions, frame divisions, opening direction and the side from which each elevation is viewed. Match opening references to the window or door schedule. Confirm clear passage dimensions, handle positions and any conflicts with walls, furniture, curtains or external shading.

Confirm the actual specification

Check system variants, profile combinations, glass composition, finish and hardware. A familiar product family name does not establish all those details. Ensure the specified thermal, acoustic and weather requirements are tied to the proposed configuration and its supporting evidence.

Review installation sections

Head, sill and jamb sections should identify the relevant substrate, frame position, supports and perimeter seals. Confirm finished floor levels and threshold build-ups. Resolve responsibility for flashings, waterproofing connections and drainage before approval; missing interfaces cannot be corrected by an elevation drawing alone.

Use controlled revisions

Give each revision a clear identifier and record changes. Avoid issuing conflicting comments through separate marked-up files. One coordinated response should distinguish approved details from items requiring correction. If dimensions remain provisional, state which units cannot be released for production until the site measurement is accepted.

Approval checklist

  • Opening references, quantities and orientation match the schedule.
  • Dimensions and required site measurements are resolved.
  • Glass, finishes and visible accessories are agreed.
  • Interfaces, supports and performance evidence are reviewed.
  • Revision, reviewer and release status are recorded.

The contractual approval responsibilities remain those agreed for the project. A drawing marked approved should not be used to conceal unresolved technical assumptions. Send significant specification changes back for review before manufacture.

Prepare with the quotation document checklist and site survey guide.

Further technical information

Schüco: example of a system with configurable facade functions. Product documentation describes particular configurations; request the applicable specification for your project.

If your project needs a coordinated drawing package, explore our 2D approval drawing and design services. The scope and deliverables are agreed for the individual project.

Discuss your project with Alumproof

Send your drawings, project location and required performance. We can review the information and clarify the system configuration and quotation scope.

Send a project enquiry

All technical guides · Technical support for architects · Explore aluminium systems

Published by Alumproof. Technical information checked on 6 October 2026. Confirm the final specification against the documentation for the selected system and project configuration.