Glazed Roof to Vertical Facade: Junction Planning

Where a glazed roof meets a vertical facade, the change in geometry needs its own detail. A roof-capable system is a useful starting point, but the project junction must also coordinate the supporting structure, water-management route and adjoining building layers. Develop that section early with the facade and roof designers.

Alumproof · Technical resources · 3 min read

Concept illustration: Glazed Roof to Vertical Facade: Junction Planning
AI-generated conceptual illustration. Refer to the selected system documentation for construction details.
On this page
  1. Define the geometry and supports
  2. Follow the drainage route through the junction
  3. Plan installation and future access
  4. Information to agree before manufacture
  5. A question to resolve early
  6. Manufacturer reference
  7. Related technical guides
  8. Discuss your project with Alumproof
Project focus: Plan the junction between a glazed roof and vertical facade, including drainage, movement and maintenance access.

Define the geometry and supports

Show roof pitch, wall alignment, structural datums and the adjoining roof or slab edge. Identify which parts support the glazing and where building movement is accommodated. The roof and vertical facade may experience different loading and service conditions. Ask the responsible designers to confirm the system variant and glass appropriate to each zone.

Follow the drainage route through the junction

Trace water from the roof surface to the intended discharge and show how the transition is sealed. Coordinate gutters, flashings and perimeter membranes with neighbouring construction. Identify access for inspection and cleaning, including concealed collection areas. Do not assume that a typical vertical mullion detail can simply be rotated into a roof application.

Plan installation and future access

Agree the sequence for supporting, glazing and closing the junction. Discuss safe maintenance access with the project team and identify how a roof pane could be replaced. Retain the approved transition detail and glass schedule at handover. Any later change to roof pitch, drainage or adjoining finishes should be reviewed against that detail before fabrication.

Information to agree before manufacture

  • Roof pitch, facade line and structural datums.
  • System variant and support arrangement for each zone.
  • Glass specification and applicable project assessment.
  • Drainage, gutter and flashing continuity.
  • Movement and perimeter sealing provisions.
  • Installation sequence and maintenance/replacement access.

A question to resolve early

Can every curtain-wall system be used as a glazed roof?

No. Confirm the permitted roof application and the relevant project design. Roof geometry, glazing, support and water management need their own assessment.

Manufacturer reference

Reynaers describes ConceptWall 50 as a facade and roof system with dedicated roof-application variants. Reynaers: ConceptWall 50.

This reference illustrates a manufacturer’s system approach. Confirm availability, applicable documentation and the final configuration with the project supplier.

Related technical guides

Discuss your project with Alumproof

Send your drawings, project location and required performance. We can review the information and clarify the system configuration and quotation scope.

Send a project enquiry

All technical guides · Technical support for architects · Explore aluminium systems

Published by Alumproof. Technical information checked on 6 October 2026. Confirm the final specification against the documentation for the selected system and project configuration.