Fire door maintenance is easier to organise when handover includes more than a set of keys. The building team needs to know which door is installed, where its documents are kept and whom to contact if it stops working correctly. A useful handover record connects each opening to its installation and future maintenance history.
Create a record for each door
Use the same reference number on the floor plan, door schedule and maintenance register. Record the location, supplier, installation date and the documented specification. Keep the relevant drawings, product documentation, installation instructions and operating guidance together, with contact details for the responsible contractor.
A simple folder structure is often enough: one building folder, a door register and clearly named records for individual openings. Photographs taken at handover can help the maintenance team identify the door and describe a later issue. They do not replace technical documentation or a competent inspection.
Include an operating demonstration
Ask the installer to demonstrate the door’s intended operation and explain the controls fitted to it. Record who attended and any outstanding work. If the door has access control, arrange a coordinated handover with the relevant contractor rather than leaving the building team to work out the interaction later.
Give facilities staff the operating and maintenance instructions for the actual installed assembly. Agree who receives fault reports, who arranges repairs and how the completion of outstanding work will be recorded.
Look for changes during everyday use
Buckinghamshire Fire & Rescue Service highlights closing problems, visible damage to leaves, frames, hinges or glazing, and damaged seals among the issues to check. Required self-closing devices should work, and self-closing fire doors should not be wedged open. Report defects promptly and obtain competent advice where the condition or performance is uncertain.
A routine visual check does not establish a door’s fire-resistance rating. Do not treat an apparently smooth opening action as proof that the complete assembly remains suitable. Likewise, do not assume that every fault requires replacement: the appropriate remedy needs assessment.
Make fault reports useful
Instead of writing “door broken”, record the door reference, date, observed symptom and any relevant photograph. For example: “Door L02 catches near the floor when closing.” This is an illustrative reporting example, not a diagnosis or a completed Alumproof project. Leave the cause and repair method to the competent contractor.
After work, keep a record of what was repaired or replaced and by whom. Changes to glazing, hardware or locking arrangements need assessment for their effect on the door’s performance. Follow the relevant manufacturer’s instructions and project requirements rather than making an improvised alteration.
Plan maintenance around the building
Agree inspection and servicing arrangements using the manufacturer’s guidance, the building’s fire-safety management requirements and the actual pattern of use. A busy reception door and a rarely used service-room door present different operating conditions. Avoid copying a maintenance interval from an unrelated building or country.
For a new supply enquiry, send Alumproof the door schedule and requested documentation. Our glazed fire door ordering checklist explains the information to collect before procurement.
Safety reference: Buckinghamshire Fire & Rescue Service: Fire doors. This source includes England-specific legal guidance; inspection obligations for your building must be established locally.
Which glazing, hardware and installation details are covered by the documentation for the complete door assembly? Identify the exact door assembly in the project documents and compare its listed components with the supplier’s documentation before approving a substitution. System details: Schüco ADS 80 FR 60.