Technical guide

Window Performance Documents: Matching the Actual Assembly

A performance document is useful only when its scope can be connected to the proposed window. The system name is a starting point; it does not establish that every size, glazing option and hardware combination shares all published results. Ask the supplier to identify the evidence applicable to the actual schedule.

Alumproof · Technical resources · 3 min read

Concept illustration: Window Performance Documents: Matching the Actual Assembly
AI-generated conceptual illustration. Refer to the selected system documentation for construction details.
On this page
  1. Identify the document and its scope
  2. Map the evidence to the schedule
  3. Control changes after approval
  4. Information to agree before manufacture
  5. A question to resolve early
  6. Manufacturer reference
  7. Related technical guides
  8. Discuss your project with Alumproof
Project focus: Match window performance documentation to the proposed sizes, profiles, glazing and opening configuration.

Identify the document and its scope

Record the issuer, date, revision and the property being demonstrated. Ask which specimen, calculation or product family the result describes. Distinguish a test result from a calculation, a declaration and general sales literature. Each can serve a different purpose, and the project brief should identify which evidence is needed for acceptance.

Map the evidence to the schedule

Mark the proposed frame combination, opening type, glazing and hardware beside the relevant document reference. Ask for clarification when project dimensions or component choices differ from the evidence. Keep unresolved questions visible before ordering. A supplier should explain the basis for applicability rather than asking the design team to infer it from the product name.

Control changes after approval

Agree a process for checking substitutions in glass, profiles, coatings or hardware against the accepted performance basis. Update the drawing and documentation register when changes are approved. At handover, retain the references that describe the supplied assemblies, so future maintenance and replacement decisions do not depend on an outdated tender-stage brochure.

Information to agree before manufacture

  • The property and required acceptance evidence for each opening.
  • Document issuer, date, revision and applicable scope.
  • Frame, glazing, hardware and operating configuration.
  • Basis for applying results to the proposed dimensions.
  • A register of approved substitutions and document changes.
  • Handover records identifying the supplied assemblies.

A question to resolve early

Does one test report establish every published performance claim?

Not necessarily. Different properties may be supported by different documents and configurations. Request the applicable evidence for each requirement and check that the supplied assembly remains within its scope.

Manufacturer reference

Reynaers’ official window catalogue provides product information; project acceptance should use the supporting documents applicable to the selected assembly. Reynaers: Window systems.

This reference illustrates a manufacturer’s system approach. Confirm availability, applicable documentation and the final configuration with the project supplier.

Related technical guides

Discuss your project with Alumproof

Send your drawings, project location and required performance. We can review the information and clarify the system configuration and quotation scope.

Send a project enquiry

All technical guides · Technical support for architects · Explore aluminium systems

Published by Alumproof. Technical information checked on 6 October 2026. Confirm the final specification against the documentation for the selected system and project configuration.