Schedule complete infill build-ups
Identify vision glass, safety glass, acoustic units and opaque panels by location. Record thickness, weight, orientation and relevant performance requirements. Keep substitutions visible in the schedule. A generic note such as double glazing does not provide enough information to select supports, seals or retention components for every infill.
Check supported junction details
Ask the facade supplier which components apply to each build-up and how the selected thickness is accommodated. Review supports and edge clearances against the documented assembly. Do not exchange gaskets or packing pieces without an approved detail. Where adjacent infills differ, check the connection rather than treating each panel as an isolated product.
Compare glass lines and finished appearance
Show the intended exterior and interior alignment on sections. Different build-ups may alter edge positions or the visible relationship with caps and profiles. Review opaque zones alongside vision glazing using samples where appearance matters. Include replacement identification in handover records so future work reproduces the approved build-up and component set.
Information to agree before manufacture
- Create a location-specific infill schedule.
- Record thickness, weight and face orientation.
- Confirm supported retention and seal components for each type.
- Review supports and clearances in the approved details.
- Check alignment where different infills meet.
- Retain assembly identities for future replacement.
A question to resolve early
Can a thicker replacement glass unit use the original seals?
Only if the supplier confirms compatibility with the complete retention arrangement. Thickness changes can require different components and can affect the assembly beyond the glass itself.
Manufacturer reference
Aluron ATF 50 documentation describes accommodation of different infill thicknesses through selected system details. Aluron: ATF 50.
This reference illustrates a manufacturer’s system approach. Confirm availability, applicable documentation and the final configuration with the project supplier.
Related technical guides
Discuss your project with Alumproof
Send your drawings, project location and required performance. We can review the information and clarify the system configuration and quotation scope.
All technical guides · Technical support for architects · Explore aluminium systems