Technical guide

Replacement Windows: Site Survey Checklist

A replacement window order needs more than the visible glass dimensions. Existing frames can conceal the true opening, substrate and installation joint. A site survey should establish what is known, what remains concealed and when final manufacturing dimensions will be confirmed.

Alumproof · Technical resources · 2 min read

Concept illustration: Replacement Windows: Site Survey Checklist
AI-generated conceptual illustration. Refer to the selected system documentation for construction details.
On this page
  1. Record the opening geometry
  2. Investigate the surrounding construction
  3. Coordinate performance and appearance
  4. Plan removal and installation
  5. Survey record checklist
  6. Further technical information
  7. Discuss your project with Alumproof

Record the opening geometry

Measure and record the opening at several positions and check squareness, level and plumb. Identify whether dimensions refer to an existing frame, a structural opening or a proposed finished opening. Use consistent opening references and photographs so that measurements can be traced to the correct unit.

Investigate the surrounding construction

Record accessible wall materials, lintel and sill conditions, finishes and evidence of water entry. Concealed support or waterproofing details may require an agreed investigation before final design. Structural changes and uncertain substrates should be referred to the appropriate project specialist.

Coordinate performance and appearance

Confirm the intended opening arrangement, glass, safety requirements and finish. Compare frame sightlines with adjacent units and consider how internal reveals will be finished. Building-specific restrictions or permissions should be checked by the project team before manufacture.

Plan removal and installation

Assess access, lifting arrangements, protection of occupied rooms and temporary weather protection. Identify which existing parts will be removed and who repairs the surrounding finishes. The quotation should state assumptions about hidden damage rather than treating every existing opening as sound.

Survey record checklist

  • Opening references and dated photographs.
  • Clearly labelled dimensions and geometry checks.
  • Substrate and sill information.
  • Access and removal constraints.
  • Unresolved concealed conditions and the plan to verify them.

Do not derive a universal manufacturing deduction from the measured opening. Required joints, tolerances and fixing arrangements depend on the selected system and installation detail. Agree final dimensions with the supplier before production release.

Next, use the shop drawing approval checklist and quotation document guide.

Further technical information

Reynaers: operation information for aluminium systems. Product documentation describes particular configurations; request the applicable specification for your project.

Discuss your project with Alumproof

Send your drawings, project location and required performance. We can review the information and clarify the system configuration and quotation scope.

Send a project enquiry

All technical guides · Technical support for architects · Explore aluminium systems

Published by Alumproof. Technical information checked on 6 October 2026. Confirm the final specification against the documentation for the selected system and project configuration.